| |
| |
Attend Siemens PLM Connection and see NX6 with Synchronous Technology.
See how Synchronous technology from Siemens PLM Software can make your design process up to 100 times faster. With this breakthrough, you no longer have to choose between constraint-driven or history-free modeling, and you can use data from multiple CAD systems. Synchronous technology is implemented in NX6.
| • |
NX6 and Synchronous Technology |
| • |
Explore NX and a personalized hands-on at the NX6 PIT STOP Challenge |
| • |
WIN attractive prizes, cool lifestyle gadgets and NX6 Test Drives certification of completion. Everyone walks away with an attractive gift. |
NX 6 with Synchronous Technology
|
| Greater Flexibility |
| Greater Flexibility with a system that works with any data. |
| • |
All: 40% cycle time reduction working with NX & foreign data –open access to data |
| |
|
| • |
CAD: 40% reuse increase from non native data – Design Freedom with multi-cad |
| |
|
| • |
CAM: 30% reduction in machining time - freeflow machining |
| |
|
| • |
CAE: 30% improvement with Multi-cad/Multi-solver |
| |
|
| |
|
|
|
 |
| Greater Strength |
| Greater Strength with applications that can solve the toughest problems. |
| • |
All: Ability to handle the MOST complex problems |
| |
|
| • |
CAD: 15% reduction in design time by leveraging knowledge capture & reuse |
| |
|
| • |
CAM: 15% improvement in machine tool utilization |
| |
|
| • |
CAE: 30% reduction in physical prototypes – leveraging Multi-CAD, assemblies, multi-physics and rapid iterations |
| |
|
|
|
 |
| |
|
|
|
| Greater Productivity |
| Greater Productivity with software anyone can use. |
| • |
All: Training time cut by 50% - Roles, CAE |
| |
|
| • |
CAD: Reduction in change time by up to 40%. – Design freedom |
| |
|
| • |
CAE: 10 fold decrease in cycle time - Model prep, one click update |
| |
|
| • |
CAM: Up to 20% reduction in programming time – OOTB Content, methods, libraries, machining tool kits. |
| |
|
|
|
 |
| Greater Coordination |
| Greater Coordination with a unified process that ensures everyone is on the same page. |
| • |
All: 20% reduced Digital Product Development time through process efficiency – shorter time to market through common product & process workflow |
| |
|
| • |
CAD: 50% decrease in rework through right first-time design |
| |
|
| • |
CAM: 20% faster programming with fewer errors |
| |
|
| • |
CAE: 70% reduction in time searching for data – synchronization to single source of data |
| |
|
|
|
 |
| |
|
|
|
|
| |
| |
| |
|
|
| SINGAPORE |
| |
Date:
Tuesday
26 August 2008
Time:
8.00am to 5.30pm
Venue:
Grand Copthorne Waterfront Hotel Singapore
392 Havelock Road
Singapore 169663 |
| |
|
| |
If you need more information please contact:
|
| |
| For Events information & registration: |
| |
Ms Rain Toh
Tel: (65) 6337 9398
Siemens_connection_sg@eventclicks.com |
| |
| Partners: |
| |
S S&I Distribution:
Tel: 65 6319 4888
ISI-Dentsu South East Asia Pte Ltd:
Tel: (65) 6511 7073
Engineering Computer Services (S) Pte Ltd (ECSS):
Tel: 65 6295 3566
Unisoft Hi - Tech Pte Ltd:
Tel: (65) 6552 0080
|
| |
| |
|
|